1. As one of the critical steps, identification of risk factors affects the
sequent risk evaluation directly.
风险因素辨识作为风险评价的关键环节之一,其结果直接影响后续的风险评价。
2. To avoid catastrophic
sequent, manpower backup plan should be initiated in the beginning phase of software project.
在软件项目的开始阶段,为避免灾难的接肿面至,人力后备计划应该被发起。
3. Short-term financing which is expected to be paid back relatively quickly, such as by a su
sequent longer-term loan. Also called swing loan or bridge financing.
预期很快会收回的短期融资,例如可通过一个相继的长期贷款收回。又叫回旋贷款或过桥融资。